
I am patching the swim platform through bolt with epoxy and 3M 5200. We discovered the leak on our cruise to Key West.
I am patching the swim platform through bolt with epoxy and 3M 5200. We discovered the leak on our cruise to Key West.
We are in the final stages of preparation for the Great Loop beginning the first week of January 2018